SteelX Rebar
On-site dosing & QA service

Blown in at the truck. Every truck on record.

McClay doses SteelX into each truck on site with a fibre blower. It goes in at the specified kg/m³, in front of your crew, and every truck is recorded in QA McClay — the app our operators use on every pour. The on-site service is available across South East Queensland.

Batch plants Adding SteelX at the plant? Download the batching method, with the batch register to record every truck. Download PDF 2 pages
Product
SteelX 5:25 / 8:45
Method
Fibre blower
Dosed in
kg/m³
Record
QA McClay
Service area
South East QLD
McClay fibre blower on site at night, blowing SteelX 5:25 from open boxes up into the drum of a concrete agitator truck
The fibre blower — SteelX into the drum, truck by truck
How we dose SteelX

Four steps, every truck

01
Confirm the dose
Specified kg/m³ and pour volume agreed before the day.
02
Check the truck
Docket and load volume checked as each truck arrives.
03
Blow it in
The fibre blower feeds SteelX into the drum in a steady stream.
04
Mix and record
The truck mixes it through; the dose is logged in QA McClay.

Why dose SteelX on site

01
Matched to each load
The dose is set by each truck's volume, not by counting bags.
02
Any supplier
The batch plant doesn't need to stock or handle SteelX.
03
On record
A per-truck record for your engineer, certifier and project file.
Quality assurance · QA McClay

“It was dosed correctly” becomes a record

A per-truck record you can produce at any time — to an engineer, a certifier, or a client years after handover.

QA McClay app showing a completed, signed-off pour at the Oceanview Hangar: 11 trucks, 71.2 m³ and 499 kg of SteelX 5:25 delivered, with a per-truck log
A real QA McClay pour record — 11 trucks, 499 kg of SteelX 5:25, signed off on the day.
Captured for every truck
✓Batch ticket and docket photo
✓Load volume and dose rate
✓Time and GPS location
✓Operator sign-off
✓Slump and water added, where available
What you receive
01
Pour report
Planned versus delivered, truck by truck.
02
Project report
Every pour in one file at handover.
03
Long-term archive
Kept for the life of the project.

Plant dosing versus McClay on-site dosing

Dosed at the plant
Dosed on site by McClay
Where it goes in
At the plant, out of your sight
At the truck, in front of your crew
Proof of dose
A line on the batch ticket
Per-truck record: photo, time, location
Supplier choice
Only plants that stock and dose it
Any supplier that suits the job
Years later
Answers from memory, if at all
Answers from the project file
For batch plants

If your plant is dosing it

Outside South East Queensland, or wherever SteelX is added at the batch plant rather than on site, this is the approved method. Print it for the loader, and record every truck on the batch register (page 2).

Download method & register
Never add the cement separately — on its own it can form balls of cement in the mix.
Completed registers — email to qa@steelxrebar.com.au. Start a new register each day, and for each client.
Free SteelX Dosage Stamp — available on request for stamping batch tickets.
Can’t follow this method? Call 1300 443 549 to confirm an acceptable alternative before batching.
01
SteelX into the agitator
Load the total volume of SteelX directly into the agitator of the truck. The boxes are not soluble — don't load them.
02
80–90% of the water
Add 80–90% of the mix water and let the SteelX mix in the water for at least 30 seconds — 60 seconds for dosages of 15 kg/m³ or more.
03
Everything else
Add aggregate, sand, cement, other ingredients and the remaining water — aggregate first where possible.
04
Record it
Note the SteelX dosage on each batch ticket and record every batch on the SteelX Batching Register.
Never add the cement separately — it can cause balls of cement in the mix.

Ask for a sample pour report

The same document you’d receive after your pour. Accept on-site dosing when you sign your SteelX quotation — available for pours across South East Queensland.

Get a free analysis on your project