SteelX Rebar
Applications & projects

Five ways SteelX takes steel off site

Every project below is real, with the dosage and the slab spec that was actually poured. Filter by what you’re building.

Sunshine Coast Recreation Centre Liberty Slab pour
Family 01
Joint free slabs

The Liberty™ Slab. All saw cut joints removed and 20% off the thickness, using 18 kg/m³ SteelX 5:25 with conventional mesh.

Typical: 18 kg/m³ SteelX 5:25 + SL72–SL102 · 140–400 mm
Chancellor State College mesh free slab ready for pour
Family 02
Mesh free slabs

Mesh replaced outright on jointed designs, using the tensile resistance method from CCAA T48. No cutting, tying, chairs or cover risk.

Typical: 7–15 kg/m³ · 8:45 at 7 kg/m³ matches 0.10% steel
Heavy traffic slab pour where mesh was retained and bar removed
Family 03
Reduced reinforcement

Mesh stays, bar goes — or the layers come down. Where a slab still needs mesh for its design, SteelX removes the bar and the doubled-up layers around it.

Typical: 12–18 kg/m³ + one mesh layer · N12-150 EW deleted
LifePointe Church bar free footing excavation ready for pour
Family 04
Bar free footings

Cages gone from strip footings, pad footings, pile caps and bored piers. Dig and pour, with steel kept only at peak stress.

Typical: 10–20 kg/m³ · up to 50% faster footing construction
Podium slab finishing at Forest Glen
Family 05
Structural watertight

Crack widths held below 0.10 mm — the AS 3735 watertightness threshold — so membranes and tanking come off the job entirely.

Typical: 15–40 kg/m³ alongside conventional reinforcement

Project reference index

28 SteelX projects, as poured. Dosages, mesh and thicknesses are the real numbers.

All 28
Joint free slabs 10
Mesh free slabs 6
Reduced reinforcement 3
Bar free footings 7
Structural watertight 2
Sunshine Coast Recreation Centre Sunshine Coast, QLD
Joint Free Slab

Liberty Slab — 150 mm thick. Originally specified as a post-tension slab, changed to a SteelX Liberty Slab with SL92 mesh and 18 kg/m³ SteelX 5:25. No joints and no visible cracks.

Toowoomba North State School Toowoomba, QLD
Joint Free Slab

Jointless topping slab — 29 m × 21 m, 70–120 mm thick. Fully restrained by edge beam with SL72 mesh, 18 kg/m³ SteelX 5:25 and E5 Internal Cure. Not a single visible crack — reported by engineer.

Jointless Freezer Slab Narangba, QLD
Joint Free Slab

31 m × 17 m unrestrained freezer slab with SL82 mesh and 18 kg/m³ SteelX 5:25. No joints and no visible cracks — critical for hygiene in cold storage environments.

Bundaberg Brewing Co. Bundaberg, QLD
Joint Free Slab

235 mm thick — 33 m × 21 m slab with large pits and full edge restraint. 23 kg/m³ SteelX 5:25 with one layer SL81 mesh bottom. Built by Hutchinson Builders. Replaced a conventional 290 mm design with N16-200 bottom + N12-200 top. No joints and no visible cracks.

MacKellar Mining Nambour, QLD
Joint Free Slab

Liberty Slab — 400 mm thick, 33 m × 12 m. SL102 mesh top and bottom with N12-500 in the long direction and 18 kg/m³ SteelX 5:25. Designed for heavy mine equipment.

Sushi Train Freezer Slab Yatala, QLD
Joint Free Slab

Liberty Slab — 150 mm thick, 26 m × 9.5 m. SL72 mesh with N12-500 in the long direction, 18 kg/m³ SteelX 5:25 and E5 Internal Cure. No joints and no cracks.

Sunshine Coast Helicopter Hangar Sunshine Coast, QLD
Joint Free Slab

Liberty Slab — 160 mm thick. Two restrained slabs: 33 m × 32 m and 33 m × 12 m. SL102 mesh with 18 kg/m³ SteelX 5:25 and E5 Internal Cure. Crack free slabs.

Rogers Cold Store Oxley, QLD
Joint Free Slab

200 mm Liberty Slab — 20 m × 22 m. 18 kg/m³ SteelX 5:25 + SL81 mesh. Replaced 35 kg/m³ double hook end fibre. Multiple projects completed 2023 and 2025.

Flat Plate House Slabs Pomona, QLD
Joint Free Slab

Five house slabs with all internal beams removed. 230 mm reduced to 180 mm. 18 kg/m³ SteelX 5:25 + SL92 mesh with E5 Internal Cure. Zero cracking.

Canberra House Slabs Canberra, ACT
Joint Free Slab

Flat plate slab design with no internal beams. 140 mm / 32 MPa. 14 kg/m³ SteelX 5:25 + SL82 central. Crack free house slabs — fully restrained.

Defence Causeways Tin Can Bay, QLD
Mesh Free Slab

12 causeway slabs, 170 mm thick, reduced from 200 mm. 12 kg/m³ SteelX 5:25 replaced two layers of SL82 mesh. E5 Internal Cure replaced curing compound. Eliminated the concrete pump.

Chancellor State College Sippy Downs, QLD
Mesh Free Slab

150 mm / 32 MPa jointed design. 8 kg/m³ SteelX 5:25 replaced SL82 mesh.

Fraser Coast Hospital Hervey Bay, QLD
Mesh Free Slab

External pavement, 170 mm / 32 MPa. 8 kg/m³ SteelX 5:25 replaced SL92 mesh. Jointed design with a perfect broom finish.

Industrial Pavement Newcastle, NSW
Mesh Free Slab

150 / 200 / 250 mm industrial pavement. 8 kg/m³ SteelX 5:25 replaced SL102 mesh. Poured over summer at +37°C, cured with E5 Internal Cure.

Storage Facility Hervey Bay, QLD
Mesh Free Slab

200 mm slab thickened for racking loads. 15 kg/m³ SteelX 5:25 replaced two layers of SL92 mesh. Cured with E5 Internal Cure.

Industrial Slab Narangba, QLD
Mesh Free Slab

5,000 m² / 160 mm industrial slab. 14 kg/m³ SteelX 8:45, cured with E5 Internal Cure. Poured in summer without a roof — no cracking.

Culvert Apron Gympie, QLD
Reduced Reinforcement

175 mm thick culvert apron. 18 kg/m³ SteelX 5:25 + SL82 mesh replaced N12-150 each way.

Boral Quarries Burleigh Heads, QLD
Reduced Reinforcement

Heavy load workshop. 220 mm slab / 50 MPa. 12 kg/m³ SteelX 5:25 + two layers of SL92 with E5 Internal Cure.

Rawcon — Heavy Traffic Slabs Sunshine Coast, QLD
Reduced Reinforcement

Early entry heavy traffic slabs, 200 mm thick. 18 kg/m³ SteelX 5:25 + SL92 mesh with E5 Internal Cure. Opened in two days, 16 m joint centres.

Grammar College Forest Glen, QLD
Bar Free Footings

Strip footings with 20 kg/m³ SteelX 5:25. All conventional steel eliminated. Easy pumping.

Industrial Foundation Caloundra, QLD
Bar Free Footings

Bored piers with 20 kg/m³ SteelX 5:25 + 1N20. Strip footings with 20 kg/m³ SteelX 5:25. Pile caps with 20 kg/m³ SteelX 5:25 + SL102 top and bottom.

Heavy Industrial Footings Murarrie, QLD
Bar Free Footings

580 m³ poured in one night at 20 kg/m³ SteelX 5:25, all pumped. Steel used only at areas of peak stress.

Industrial Bored Piers Caboolture, QLD
Bar Free Footings

25 MPa bored piers. 15 kg/m³ SteelX 5:25 + 1N24 bar. Steel cage eliminated.

Commercial Pad Footing Gold Coast, QLD
Bar Free Footings

10 kg/m³ SteelX 5:25. Cage eliminated.

Industrial Strip Footings Aura, QLD
Bar Free Footings

20 kg/m³ SteelX 5:25. Cage eliminated — dig and pour.

LifePointe Church Maroochydore, QLD
Bar Free Footings

20 kg/m³ SteelX 8:45. Removed all other steel.

Mooloolaba Basement Slab Mooloolaba, QLD
Structural Watertight

450 mm thick basement slab. N16-200 EW top and bottom reduced to SL81 top and bottom + SteelX — achieving watertight concrete by design, without membranes.

Podium Slab — Industrial Forest Glen, QLD
Structural Watertight

Trafficable membrane removed. 30 kg/m³ SteelX 5:25 to control crack widths below 0.10 mm, with E5 Waterproofing dosed at Mansell Premix.

Project data as recorded by McClay Industries Pty Ltd.

Get a free analysis on your project

Send us your drawings and we’ll show you what comes out: the mesh, the rebar, the thickness, the weeks.